Wholefolk — Roadmap¶
Status:
[HYPOTHESIS]— Phase 0, research only.
Phase 0 — Research (current)¶
Exit criteria:
- Survey of existing real-world systems published
[HYPOTHESIS]— initial seed in Research; citations and verification still required. - Each surveyed system either verified (sources attached, scale claims checked) or marked
[CITATION NEEDED]. - Comparison matrix mapping system types to wholefolk's hypothesized requirements — including carbon dimensions, not only governance / sovereignty / economic dimensions.
- Architecture proposal: whether wholefolk is (a) an MPowerUP module, (b) an independent platform sharing infrastructure, or (c) not worth building.
- Phase 1 scope decision and go/no-go.
Not in scope for Phase 0: writing platform code, recruiting pilot partners, token design, funding pitch.
Go / No-go gates¶
The Phase 0 → Phase 1 decision is gated on three credibility questions, all of which must be answered honestly before the project advances:
- Technical credibility — Is the proposed integration with MPowerUP + Toaster Chef actually viable, or does it force design conflicts (e.g., does MPowerUP's privacy/Circle model break under a procurement context)?
- Carbon credibility — Is the carbon-reduction claim credible? Local supply chain is the core thesis, but any carbon benefit is currently unmeasured
[HYPOTHESIS]. This gate sits alongside technical credibility, not beneath it. - Regulatory credibility — Are the regulatory implications (settlement, tokenization, commercial procurement) understood well enough to proceed?
Phase 1 — TBD [HYPOTHESIS]¶
Phase 1 scope is intentionally undefined until Phase 0 resolves the architecture and viability questions. Options under consideration:
- Option A — Spec wholefolk as an MPowerUP module; contribute upstream to MPowerUP Phase 3+.
- Option B — Build a minimal procurement prototype against Kitchen Garage as the first real user.
- Option C — Pause; Phase 0 concluded existing systems already cover the gap.
Option C is a valid and welcomed outcome. Per the Epistemic Honesty Directive, if the research concludes the project should not be built, that conclusion is published the same way a positive finding would be.
Known Unknowns¶
- Timeline for Phase 0 — depends on research depth and whether the Red Team / Adversarial Tester agent is dispatched against the system survey.
- Whether wholefolk's existence should be made public (current state: internal, pre-public).